Location: ID2 thermal compressor 1
AL016
Location: ID9 Thermal Compressor 2
AL017
Position: External Alarm pCOe ID1
AL018
Location: ID1-side flow geothermal well
AL019
Location: ID4 Heat pumps / RCS
AL020
Location: ID10 water flow system side
AL021
Location: ID7 alarm boiler / res. integr. plant
AL022
Location: ID5 humidity alarm / digital input deumid
AL023
Position: Alarm ID6 thermal resistance accumulation ACS ingr. digital
AL024
AL025
Position: B-12 Low Pressure serious compressor / transducer from the
AL026
AL027
Antifreeze geothermal heat exchanger
AL028
AL029
AL040
AL041
AL042
AL043
AL044
AL045
Procedure for legionella is not finished
AL053
High compressor discharge temperature
AL054
Reached the threshold of hours worked incl. 1
AL055
Reached the threshold of hours worked incl. 2
AL056
Reached the threshold of hours worked geo pump
AL057
Reached the threshold of hours worked primary pump
Reached the threshold of hours worked DHW pump
AL058
AL059
Reached the threshold of hours worked pump mix zone 1
AL060
Reached the threshold of hours worked pump mix zone 2
AL061
Reached the threshold of hours worked pump mix zone 3
AL064
High water temperature discharge zone 1
AL065
Low water temperature discharge zone 1
Expansion pCOe offline option
Antifreeze exchanger system
Frost build-up health
Room 1 air frost
2 bedroom air frost
3 bedroom air frost
Antifreeze room air 4
Antifreeze air room 5
0s
0s
0s
Imp.
Heat pumps or research phase sequen-
0s
ce
Imp.
0s
0s
alarm Dehumidifier
0s
pCOe expansion (address 10)
0s
0s
exhaust system
Imp.
Imp.
Imp.
Gas flow temperature (B9)
Imp.
0s
0s
0s
0s
0s
0s
0s
0s
39