Grohe Eurofresh 19 200 Guia De Inicio Rapido página 4

Installation
1. Remove the two screws (A1) from the fitting template (A),
then remove the template, see fold-out page I, fig. [1].
2. Turn the valve stem (C) clockwise to the OFF position.
3. Make sure the water supply is turned on at the service
stop valves (B). Stop valves must be in fully open
position (slots horizontal) for valve to function.
4. The adjustable hot water limit stop (D) is factory set at
neutral position to give maximum outlet temperature, see
fig. [2] and [6].
Please refer to chapter "Maximum hot water limit setting"
for limiting maximum outlet temperature.
5. Install lever adapter (E) onto the valve stem (C), by
placing the lever stop pin (E1) on top of the "Arrow" ↑ (F),
then tighten with screw (G).
6. Push cap (H) with drain hole facing down onto the plastic
guide (J) by gently pressing the slotted section (J1) on the
plastic guide.
7. Slide the escutcheon mounting base (K), over the cap (H)
and tighten with screws (K1), see fig. [3].
Do not use excessive force to tighten the screws.
8. Clip escutcheon (L) into escutcheon mounting base (K).
9. Fit insulator (M) onto cartridge actuating lever and fit
screw (N), see fig. [4].
10. Fit lever (P), secure by tightening the fitted set screw (P1)
with a 3mm hex key.
11. Insert plug (O).
The pressure balancing valve is now ready for use.
Caution!
Do not lift the lever on the handle to operate this valve.
This pressure balancing valve opens from cold to hot by
turning the lever counterclockwise, see fig. [5].
If the pressure balancing valve is installed too deep, the
fitting depth can be increased by 1" with an extension set, Part
No. 47 344, see fold-out page II.
Maximum hot water limit setting
The adjustable hot water limit stop (D) is factory set in a
neutral position (0), see fig. [6].
On applications requiring to limit the valve opening from full hot
position, the factory set adjustable hot water limit stop must be
reset as described below.
1. Remove the factory set adjustable hot water limit stop (D),
see fold-out page III, fig. [7].
2. Slide the lever adapter (E) onto the valve stem (C), by pla-
cing the lever stop pin (E1) on top of "Arrow"
out page I fig. [6] and fold-out page III fig. [8].
3. Turn the lever adapter (E) counterclockwise until the outlet
water reaches the desired temperature and read the
corresponding number (1 to 10, see fig. [6]) against the lever
stop pin (E1).
1
English
4. Close the valve by turning the lever adapter (E) clockwise
and remove the lever adapter.
5. Align the white mark (D1) on the limit stop against the
number (1 to 10, see fig. [6]) you have selected on the dial
and slide the limit stop, see fig. [9].
6. Proceed to item 5 in chapter Installation.
Note:
The preset maximum temperature will change if the inlet
temperatures change or the setting of the water heater
thermostat is altered.
Winterizing the system
It is recommended that the "Integral check pressure balan-
cing cartridge" must be removed from the valve casing
during the system shut off for winterizing.
Maintenance
Check, clean and if necessary, replace parts.
Grease with special valve grease (Cat. No. 18 012)
Pressure balancing cartridge, see figs. [10] to [13].
1. Lever out plug (O).
2. Loosen set screw (P1) with a 3mm hex key.
3. Pull off lever (P).
4. Remove escutcheon (L) as shown in fig. [11].
5. Remove screws (K1) and pull off mounting base (K), see
fig. [10].
6. Shut off hot and cold water stops (B). The slots are
vertical when the stops are in the off position, see fig. [12].
7. Pull off cap (H), see fig. [13].
8. Loosen screws (J2) and detach plastic guide (J) with
sleeve.
9. Detach stop ring (R) and note position.
10. Loosen the four corner screws (S1) and remove valve
cover (S).
11. Pull the existing pressure balancing cartridge (T) out of
the valve body noting the location of "H" and "C" marking
near the cartridge inlets.
12. Remove check valves (U).
The pressure balancing cartridge (T) must be replaced as a
complete unit.
Reassemble in reverse order. Ensure that the hot "H" and
cold "C" markings are on the correct side.
Be sure that the stop ring (R) is installed in the position noted
in item 9.
Replacement parts, see fold-out page II (* = special
accessories)
(F), see fold-
Care
Instructions for care of this faucet will be found in the Limited
Warranty supplement.
loading