4.1.2
To open the switch box cover of the
outdoor unit
3×
4.2
Mounting the outdoor unit
4.2.1
To provide the installation structure
INFORMATION
For information on the available options, contact your
dealer.
If the unit is installed directly on the floor, prepare 4 sets of M8 or
M10 anchor bolts, nuts and washers (field supply) as follows:
INFORMATION
The maximum height of the upper protruding part of the
bolts is 15 mm.
(mm)
In any case, provide at least 300 mm of free space below the unit.
Additionally, make sure the unit is positioned at least 100 mm above
the maximum expected level of snow.
EBLQ05+07C2V3
Daikin Altherma monobloc compact outdoor unit
4P598846-1 – 2019.10
0 mm
(mm)
a
Maximum snowfall height
It is possible to install the unit on brackets to the wall:
a
(mm)
a
Maximum snowfall height
4 Installation
Installation manual
5