5 Starting up the outdoor unit

2 Connect the interconnection cable and power supply as follows.
Ensure stress relief by using the wire clamp.
1N~ 50 Hz
220-240 V
a
Interconnection cable
b
Power supply cable
c
Fuse
d
Earth leakage circuit breaker
L N PWR
1
2 3
L
N
12 3
6

Technical data

A subset of the latest technical data is available on the regional Daikin website (publicly accessible). The full set of latest technical data is
available on the Daikin extranet (authentication required).
Installation manual
10
d
c
b
a
a
a
Wire clamp
3 Reattach the switch box cover.
4 Optional: Attach the wire clamp (accessory) to the screw of the
refrigerant piping cover, and fix the cables to it with a cable tie.
5 Connect an earth leakage circuit breaker and fuse to the power
supply line.
4.7
Finishing the outdoor unit
installation
4.7.1

To finish the outdoor unit installation

1 Insulate and fix the refrigerant piping and interconnection cable
as follows:
c
a
d
b
e
f
a
Gas pipe
b
Gas pipe insulation
c
Interconnection cable
d
Liquid pipe
e
Liquid pipe insulation
f
Finishing tape
2 Install the service cover.
5
Starting up the outdoor unit
See the indoor unit installation manual for configuration and
commissioning of the system.