Installing the volume measuring
section
!
The heat meter must be protected against
magnetite and dirt for the device's entire wor-
king life.
1
For new installations, rinse the pipe thoroughly
in advance with the meter replacement pipe
section.
2
Deactivate the pump
3
Close isolation valves upstream of the strainer
and downstream of the VMT.
4
Remove meter replacement pipe section or old
meter.
5
Remove old seals.
6
Clean the sealing surface.
Install the VMT and use new seals.
7
8
Open the shut-off valves slowly. Observe the
order and direction of flow:
in the inlet pipe
in front of the volume measuring section
behind the volume measuring section
9
At the same time, the VMT is bled.
10
Activate the pump.
11
Implement a function check.
12
Seal the VMT.
www.techem.de
Symbols
e.g. 1
PN / PS
e.g. DE-07-MI004-... Conformity number
CE M... ...
3
qi [m
/h]
qp [m
3
/h]
qs [m
3
/h]
e.g. DN15
000
m
3
Recording precision
class
Pressure level
Calibration year,
notified body ...
Lowest flow rate
(at qi/qp = 1:50)
Nominal flow rate
Highest flow rate
Connection nominal diame-
ter
Horizontal
Vertical
Installation position can be
chosen freely