Installation; Preparatory Work - BKS B 1956 Manual De Instalación

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

4.

Installation

4.1

Preparatory work

Before starting the installation, check that all the required products are complete and functional.
Correctly mount/deburr profile cutouts / hardware drill holes / cable bushings in accordance with
Appendix 2 or the relevant enclosed manual. Thoroughly remove swarf.
Attention electronics: make sure the lock recess is free of swarf and clean!
NOTE
Pull in cable on the safeguarded side of the door without bending or buckling it. Provide for a
sufficiently large cable loop at the lock.
Protect the cable against abrasion!
Provide a cable disconnection point in the area of the cable link to make it easier to remove the door.
Max. cable length from the lock to the control unit/junction box is 10 m (length of pre-assembled
cable). In addition, larger cable cross-sections may be required to prevent voltage drops (see fig. 3).
2
A (mm
)
0.14
0.25
0.34
0.5
0.75
Fig� 3: cable lengths
Length of connecting cable B 5490 0300 (in m)
10
8
15
17
19
22
22
27
28
35
36
47
LA
Distributor/
Branch
6
4
2
Extension (in m)
19
21
23
26
29
33
31
36
41
42
49
56
57
68
78
LB
LA
LB
Control
23
Tabla de contenido
loading

Este manual también es adecuado para:

B 195962.145.7562.145.7662.145.7762.145.78

Tabla de contenido