Idiomas disponibles

Idiomas disponibles

Enlaces rápidos

H-7605
MONITOR ARM
TOOLS NEEDED
Electric
7/16"
Drill
Drill Bit
M6 x 35 mm Allen Head Bolt x 2
Small Phillips Head Bolt x 8
NOTE: Monitor arm includes hardware to
attach to wall or Uline Deluxe Workstations and
Packing Stations.
UPRIGHT MOUNTING
1. Align monitor arm mounting bracket with upright at
desired height.
2. Secure to upright with two M6 x 35 mm or M6 x 50 mm
Allen head bolts, two 6.4 x 18 mm washers and two
hex nuts using an Allen wrench and 10 mm wrench.
(See Figure 1)
Figure 1
Allen
Head Bolts
6.4 x 18 mm
Washers
Upright
PAGE 1 OF 6
1-800-295-5510
uline.com
Phillips Head
Phillips
Drill Bit
Screwdriver
M6 x 50 mm Allen Head Bolt x 2
Large Phillips Head Bolt x 8
INSTALLATION
Allen Wrench
10 mm
(included)
Wrench
HARDWARE
Flange Nut x 2
5.3 x 14 mm Washer x 4
WALL MOUNTING
HARDWARE FOR WALL MOUNTING
ST 5.5 x 60 mm
Hex Screw x 2
1. Align monitor arm mounting bracket with wall at
desired height. Mark holes where screws are to be
located. Drill holes using 7/16" drill bit. (See Figure 2)
Insert plastic anchors into predrilled holes.
Figure 2
Para Español, vea páginas 3-4.
Pour le français, consulter les pages 5-6.
6.4 x 18 mm
Washer x 2
6.4 x 12 mm Washer x 2
Plastic Anchor x 2
0521 IH-7605
Tabla de contenido
loading

Resumen de contenidos para Uline H-7605

  • Página 3: Brazo Para Monitor

    INSTALACIÓN EN PARED NOTA: El brazo de monitor incluye tornillería para fijarlo en la pared o en las Estaciones de Trabajo de Alta Calidad y las de Empaque Uline. TORNILLERÍA PARA INSTALACIÓN EN PARED INSTALACIÓN DEL POSTE 1. Alinee el soporte de instalación del brazo de...
  • Página 4: Continuación De Instalación

    Fije el monitor a la placa. (Vea Diagrama 5) Diagrama 7 cerrar las cubiertas. Llave Rondana de Allen 5.3 x 14 mm Use los pernos adecuados Diagrama 5 para el monitor. 800-295-5510 uline.mx PAGE 4 OF 6 0521 IH-7605...

Tabla de contenido