Ferm Industrial CDM1147P Traducción Del Manual Original página 6

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 29
Hand-arm vibration ah,D
(Drilling into metal)
Charger
Charger input
Charger output
Charging time 2Ah battery
Charging time 4Ah battery
Recommended batteries
Weight
Battery
Battery Type
Voltage
Capacity
Recommended charger
Weight
Vibration level
The vibration emission level stated in this instruction
manual has been measured in accordance with
a standardized test given in EN 62841; it may be
used to compare one tool with another and as a
preliminary assessment of exposure to vibration
when using the tool for the applications mentioned.
• Using the tool for different applications, or with
different or poorly maintained accessories, may
significantly increase the exposure level.
• The times when the tool is switched off or when
it is running but not actually doing the job, may
significantly reduce the exposure level.
Protect yourself against the effects of vibration by
maintaining the tool and its accessories, keeping
your hands warm, and organizing your work patterns.
Description
The numbers in the text refer to the diagrams on
pages 2- 3
Fig. A
1. Machine
2. Battery
3. Battery unlock button
4. Battery charge indication
5. Charger
6. Charger LED indicators
6
<2.93 m/s
K=1.5 m/s
2
2
CDA1131P
100-240VAC 50-60Hz,
50W
20V 2A
60 minutes
120 minutes
CDA1132P, CDA1133P
0.36 kg
CDA1132P
Lithium-Ion
20V
2.0 Ah
CDA1131P
0.38 kg
7. Chuck
9. Gear selection switch
10. Direction switch
11. On / off switch
12. Torque adjustment ring
13. Operation mode ring
14. Belt hook
15. Work light
3. OPERATING
The battery must be charged before first
use.
Removing the battery from the machine
Fig. B
• Hold the machine (1) firmly with one hand
• Push down the battery unlock button (3)
located on the rear side of the battery (2) with
the other hand.
• Keep pushing this button (3) down and slide
the battery backwards out of the machine, like
shown in Fig. B.
Inserting the battery into the machine
Fig. B
Ensure that the exterior of the battery is
clean and dry before connecting to the
charger or machine.
• Hold the machine (1) firmly with one hand
• Insert the battery (2) into the base of the
machine as shown in Fig. B.
• Push the battery further forward until it clicks
into place.
Checking the battery charging status
Fig. C
The included battery is delivered in partly
charged condition.
• To check the battery charge status, push the
button (4) on battery shortly.
• The battery has 3 lights indicating the charge
level, the more lights that burn, the more
charge the battery has left.
Tabla de contenido
loading

Tabla de contenido