English
Español
Energi Savr Node
Step-by-step installation instructions
Step 1: Mounting the Energi Savr NodeT with
EcoSystemR unit
Note: Mount the Energi Savr NodeT with EcoSystemR unit in a
position where it can be easily located and accessed if service
or troubleshooting is necessary. The Energi Savr NodeT with
EcoSystemR unit should be mounted with the directional arrows
on the label pointing upwards.
• For indoor use only!
• C hoose panel mounting location so mains voltage wiring is at
least 1,8 m from audio or electronic equipment and associated
wiring (prevents radio frequency interference).
• Install in accordance with all national and local electrical codes.
Use an IP20 (minimum) rated consumer panel or breaker
panel with integrated DIN rail and dead cover. The
Energi Savr NodeT with EcoSystemR unit is 161,7 mm
(9 DIN modules) wide.
To clip the Energi Savr NodeT with EcoSystemR unit onto the DIN
rail:
1. Hook the Energi Savr NodeT with EcoSystemR unit onto the top
of the DIN rail.
2. Pivot the Energi Savr NodeT with EcoSystemR unit onto the
DIN rail.
3. Press until the Energi Savr NodeT with EcoSystemR unit clips
lock into place.
To remove the Energi Savr NodeT with EcoSystemR unit from
the DIN rail:
1. Verify power to the unit is turned off.
2. Using a screwdriver, pull the orange clips until they click into the
unlocked position.
3. Reverse the steps above.
International Energi Savr Node
English
Français
Português
with EcoSystemR
TM
with EcoSystemR Installation Guide
TM
Italiano
Deutsch
|
Installation Guide
Locked
中文
Unlocked
Lutron
3
|
®