Starting Instructions - Core Cub Cadet CCB410 Manual De Instrucciones

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

INSTALLING THE NOZZLE
The nozzle must be attached to the
blower air tube to maximize the air flow
and to allow you to direct the air flow.
1. Slide the slots (1) in the nozzle (2)
over the matching keys (3) on the air
tube (4) (Fig. 3).
2. Push the nozzle fully onto the air
tube until the locking keys on the air
tube align with the locking slots (5)
in the nozzle.
3. Rotate the nozzle counter clockwise
to lock the nozzle onto the air tube.
NOTE: When the nozzle is fully locked
onto the air tube, the rectangular
opening in the nozzle will be parallel to
the ground.

STARTING INSTRUCTIONS

To prevent the motor from starting
accidentally, the lock-off button and
throttle control must both be engaged
to start the unit.
1. Install the power cell. Refer to
Installing the Power Cell in the Drive
Unit manual.
2. Push the lock-off button (2) into the
throttle control (1) and hold it in
place (Fig. 4).
3. While continuing to hold the lock-off
button, squeeze and hold the throttle
control to start the unit (Fig. 4).
4. Continue to squeeze the throttle
control for operation.
ASSEMBLY AND OPERATING
1
2
5
1
14
3
Fig. 3
2
Fig. 4
4
Tabla de contenido
loading

Tabla de contenido