Assembly And Operating - Core Cub Cadet CCB410 Manual De Instrucciones

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

INSTALLING THE DRIVE UNIT ON
THE LEAF BLOWER ATTACHMENT
NOTE:
The Power Lok
must be installed on the Leaf Blower
Attachment. If the unit you purchased
does NOT include the drive unit, one
must be purchased separately. Refer
to the Accessories section.
WARNING:
Cell from the drive unit before
installing the drive unit on the blower
attachment.
1. Pull the locking lever (1) outward from
the locking collar (2). Align the groove
(3) in the locking collar with the
matching key (4) on the end of the
blower attachment shaft (5) (Fig. 1).
2. Insert the blower attachment shaft
into the locking collar until the
installation mark (6) meets the
locking collar.
NOTE: Make sure the blower
attachment shaft is fully inserted into
the locking collar. If it is not fully
inserted, the electrical connection will
not be made and the blower attachment
will not function properly.
3. When the blower attachment shaft is
fully inserted into the locking collar,
push the locking lever back toward
the locking collar to lock the
assembly together (Fig 2).
NOTE: Make sure the locking lever is
fully pressed toward the locking collar.
This is important to ensure the
assembly is properly locked together.

ASSEMBLY AND OPERATING

TM
Drive Unit
Remove the Power
4
6
13
2
3
5
Fig. 1
Fig. 2
1
Tabla de contenido
loading

Tabla de contenido