Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 98

Fault clearance

Before you look for a fault on the meter itself, please check the following items:
• Is the system running? – Is the circulation pump running?
• Are the shut-off devices fully open?
• Is the pipe free (possibly clean the strainer)?
• Is the dimensioning okay?
In case of error F -6, execute the following steps:
1
Check the meter installation.
2
Generate a positive flow.
3
Check the current flow (LCD).
4
Wait until the LCD is off again (approx. 2 mins.).
5
Press the button again.
The result of flow direction recognition is only displayed after 8s.
6
Check LCD as to whether F -6 is now off.
!
If F-6 does not cease, you must replace the meter.
Display levels
The display is switched off under normal operation. Approx. 2 minutes after the last time a
key is pressed, the display is deactivated automatically. The flow rate / temperature display
is always updated every 8s. (Without the flow rate, the temperature is only measured
every 15 minutes.)
The meter has 4 display levels.
A long button push switches between the display levels. A brief button push jumps to the
next display within a level 
Key for
2
1
Readout level
1-01
Cumulated energy since
commissioning
1-02-1
Display test "everything on"
1-02-2
Display test "everything off"
1-02-3
Display test "UHF ON/OFF"
1-02-5
Due date value
1-02-6
Due date*
2
2-01
2-02
2-03
2-04
2-05
2-06
2-07
2-08
2-09
2
Service level
Cumulated volume since commissioning
Current flow rate
Inlet temperature
Outlet temperature
Temperature difference
Current performance
Next due date
Device number
Firmware version number
15
Tabla de contenido
loading

Tabla de contenido