Base Frame Anchor Holes – 4 pre-drilled base frame
anchor holes are provided inside the base frame to
secure the lift to the floor or installation surface.
Tools Required
• Banding or Strap Cutters
• Drill with 1/2" concrete drill
• 3/4" closed end wrench
DANGER! The lift's electrical circuits use
voltages which can cause SEVERE PERSONAL
INJURY or DEATH.
1.
Using a forklift or similar equipment, move the
palletized lift to the location it is to be installed. The
installation area should be clean and have good
general lighting.
2. Next, using the strap cutter, remove the bands
securing the lift to the pallet. Remove all packing
material and place it off to the side.
3. Locate a separate box that contains the hand
control. This box is located under the primary
packaging material at the end of the base frame.
Remove the hand control with the control cord from
the box. Next, insert the control cord disconnect
plug into the mating receptacle at the end of the
base frame. Ensure the plug is fully connected and
the locking tabs are positioned over the posts on the
disconnect receptacle
4. Locate the power cord attached to the lift's base
frame. All lifts are supplied with a power cord
plug for use with a conventional 115 volt (20 amp)
receptacle. Ensure the receptacle to be used is
rated for 115 volt, 20 amp operation. Insert the plug
into the receptacle.
5. Using the hand control, depress the UP button to
raise the lift to its maximum raised height. Following
the maintenance bar operating instructions, (See
Page 5) rotate the maintenance bars into the
maintenance position.
CAUTION! DO NOT lower the lift to engage the
maintenance bars at this time.
6. Using a forklift, position the forks under the platform
structure. (See Figure 2) Lift the lift table off the pallet.
Next, remove the pallet and place if off to the side.
Position the lift in the desired location. Use care not
to damage the lift's power cord or control cord.
PAGE 3 OF 21
INSTALLATION INSTRUCTIONS CONTINUED
Figure 2
NOTE: The base frame must be secured to the
floor for maximum stability. Contact ULINE
Customer Service if you have any questions
regarding the proper installation of the lift.
Complete steps 7 and 8 to secure lift to the floor.
7.
Inside the base frame are four 5/8" holes for bolting
the unit securely to the floor. Using the 4 holes as a
template, drill a 1/2" diameter hole to a 3" minimum
depth at each location. The floor surface should be
level and the drilled holes perpendicular to the floor.
If required, shift the position of the lift with a forklift
to allow room for drilling, then drill. When complete,
reposition the lift.
8. Prepare the 1/2" diameter x 4" long anchor bolts
(USE type SUP-R-STUD #26-12400 or equivalent) by
assembling the washer and nut on the anchor bolt.
(See Figure 3) The nut should be screwed onto the
anchor bolt approximately 1/2 the nut height. Drive
the assembled anchor through the mounting hole
into the concrete until the washer is flush with the top
of the anchor plate. Expand the anchor shield by
tightening the nut 3 to 5 turns. Repeat step 8 for the
remaining anchors.
Figure 3
NOTE: Make sure the underside of the base
frame surface is fully supported with shims
or concrete grout.
0421 IH-3934