Tabla de contenido
Idiomas disponibles

Idiomas disponibles

7) Striker installation (fig.8, 9):
a) place the striker against the frame profile and bring it near the spring latch
b) make sure the striker is in contact with the spring latch and that the door opens without interfering with the
striker when the bar is pressed. In case of interference or no contact, reposition the striker, using the shims
supplied in the pack, until finding the correct position
c) make 2 Ø3.2 side holes using the striker as a template
d) secure the striker and possible shims with 2 Ø3.9 self-tapping screws supplied with the product
e) adjust the position of the striker to obtain correct compression of the door seals
f) make the Ø3.2 middle hole (using the striker as a template) and secure with the third Ø3.9 self-tapping screw
g) press the bar all the way and check correct opening of the door.
Fig. 8
8 - Fire barrier striker installation:
a) place the striker on the frame profile and bring it near the spring latch (fig. 12).
b) make sure the striker is in contact with the spring latch and that the door opens without interfering
with the striker when the bar is pressed. In case of interference or no contact, reposition the striker,
using the shims supplied in the pack, until finding the correct position (fig. 13, 14).
c) make 2 Ø4.2÷Ø4.5 side holes for the fixing screws.
d) secure the striker and possible shims with the 2 M4 screws supplied with the product.
e) press the bar all the way and check correct opening of the door.
Fig. 10
Building occupiers or their representatives must perform the following maintenance checks at least once a month.
1) - Operate the emergency opener and make sure that all its component parts are fully functional. Check that all fixing
screws are tight.
2) - Check that all strikers are unobstructed and securely fixed to the frame.
3) - Check that the spring latch and striker contact surfaces are adequately lubricated. If necessary, grease them as
instructed in point 10 of the assembly and installation instructions.
4) - Record the checks in the "Maintenance Records".
ISTRUZIONI - INSTRUCTIONS - INSTRUCTIONS - INSTRUCCIONES
Fig. 9
Fig. 11
Fig. 12

MAINTENANCE INSTRUCTIONS

- 18/40 -
DOOR OPENING CURVE
DOOR OPENING CURVE
DOOR OPENING CURVE
I0326001/03-2018
Tabla de contenido
loading

Este manual también es adecuado para:

07418

Tabla de contenido