Kobe Range Hoods CH-179 Serie Manual De Instrucciones página 9

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

1.
Puncture the knockout holes on the hood as shown in Figure 4.
2.
Unscrew the six screws on the bottom casing. Remove the bottom casing. If necessary,
arrange the electrical wires to run through the 1" diameter hole on the hood. Refer to
Figure 5.
3.
Using references on Table 1 and measurements on page 21, center the hood in place
beneath the cabinet and flush with the front of the cabinet.
4.
Draw electrical wires through cabinet access opening.
5.
Place screw (not provided) into the exact center of each knockout hole. Make sure all
screws are in place before tightening screws. CAUTION: MAKE SURE THE HOOD IS
SECURE BEFORE RELEASING.
Ductwork Installation
6.
Use aluminum or steel pipe to connect the plastic exhaust on the hood to the ductwork
above. Use duct tape to make all joints secure and air tight.
7.
Continued on page 16.
Figure 4
8
1" Diameter
Hole
Figure 5
Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

Ch7930sqCh7936sqCh7942sqCh7948sq

Tabla de contenido