Kobe Range Hoods CH-179 Serie Manual De Instrucciones página 11

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

1.
Puncture the knockout holes on the hood as shown in Figure 10.
2.
Unscrew and remove the multi duct exhaust. Replace with {D} vent cover (top) on page
3. Refer to Figure 11.
3.
Unscrew the six screws on the bottom casing. Remove the bottom casing. Arrange the
electrical wires to run through the 1" diameter hole on the top or the rear of the hood.
Refer to Figure 12.
4.
Using references on Table 1 and measurements on page 21, center the hood in place
beneath the cabinet and flush with the front of the cabinet.
5.
Place screw (not provided) into the exact center of each knockout hole. Make sure all
screws are in place before tightening screws. CAUTION: MAKE SURE THE HOOD IS
SECURE BEFORE RELEASING.
Ductwork Installation
6.
Use aluminum or steel pipe to connect the exhaust opening at the rear of the hood to the
ductwork. Use duct tape to make all joints secure and air tight.
7.
Continued on page 16.
Figure 10
1" Diameter Hole
Figure 12
10
Figure 11
Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

Ch7930sqCh7936sqCh7942sqCh7948sq

Tabla de contenido