Installation - Klarstein METROBREEZE 9 PARIS Manual De Instrucciones

Ocultar thumbs Ver también para METROBREEZE 9 PARIS:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

EN
26

INSTALLATION

Caution: Danger of injury
In the moving process, ensure that the air conditioning is in the
upright position and the air conditioning should be placed on
a flat surface. Do not install and use the air conditioning in the
bathroom or other humid environments.
Install the window sealing plate assembly
1.
Half open the window, and mount the window sealing plate assembly to the
window (as shown in Figure 2 and Figure 3); the assembly can be placed in
horizontal and vertical direction.
2.
Pull various components of the window sealing plate assembly open, adjust
their opening distance to bring both ends of the assembly into contact with
the window frame, and fix various components of the assembly.
Install the heat pipe assembly
1.
Screw the heat pipe assembly (exhaust fitting end) into the exhaust port on
the rear panel (counterclockwise).
2.
Connect the heat pipe to the window sealing plate..
Install the body
1.
Move the machine with installed heat pipe and fittings before the window, and
the distance between the body and walls or other objects shall be least 50 cm.
2.
Elongate the heat pipe and snap the flat end of the heat pipe joints into the
elliptical hole of the window sealing plate assembly.
3.
The flat end of the heat pipe joints must be snapped into place.
4.
The pipe cannot be distorted nor has substantial turning (greater than 45 °).
Keep the ventilation of the heat pipe unobstructed.
Tabla de contenido
loading

Este manual también es adecuado para:

10028189

Tabla de contenido