2
Unhook the wiring clamp to open
it, route the cables that go to the
ceiling suspension arm and IP
converter through the wiring
clamp, and then close the wiring
clamp.
If the lid of the cable cover was
not removed in step 1, you can
skip this step and proceed to
step 3. In that case, adjust the
cables that go to the ceiling
suspension arm and IP converter
in step 4.
3
Attach the cable cover as shown
in the following diagram,
attaching it on the right side as
viewed from the rear of the
monitor using a supplied M4
screw (large).
The M4 screw (large) attachment
point varies depending on the
monitor. For details, refer to the
"Attaching the cable cover"
section in the "Attachment
method for monitors" document.
This document describes the
attachment of the AC adaptor
bracket on the left side, as viewed
from the rear of the monitor, as
an example.
(A)
Tip
The screw used on the left side as
viewed from the rear of the
monitor is attached later.
4
Adjust the cables.
The routing of cables varies
depending on the cable. Route
according to the following
guidelines.
Cables connecting the ceiling
suspension arm and IP
converter
If the cable cover was removed in
step 1, route via (A) in the
following diagram.
DC IN cable of the AC adaptor
(with AC adaptor bracket)
Route via (B) in the following
diagram.
The routing location of the DC IN
cable of the AC adaptor varies
depending on the monitor. For
details, refer to the "Routing the
AC adaptor DC IN cable" section in
the "Attachment method for
monitors" document.
DC IN cable of the AC adaptor
(without AC adaptor bracket)
If the lid of the cable cover was
removed, route via (C) in the
following diagram.
11
Mounting
GB