G. REPLACING QUARTZ TUBES
CAUTION: the guarantee does not cover lamp and
quartz tube breakage during removal and assembly
operations
1
2
Insert the new quartz sheath in the reactor, taking care to keep it straight
3
Slot the base of the tube into position. If the tube is correctly positioned, it will feel
4
Place the white plastic washer inside the stainless steel thread
5
6
Notice V3 IAM Anglais.doc
Registered Brand, Models and patents – exclusive products
Fit the new O-ring in its housing
supple (pneumatic effect).
Screw back the stainless steel screw and refit the lamp
Take the new quartz sheath
Copyright BIO-UV
Page 11