Eaton Powerware 5125 Guia De Instalacion página 26

Ocultar thumbs Ver también para Powerware 5125:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

INSTALLATION
7.
8.
NOTE The batteries charge to 90% capacity in approximately 3 hours. However, it is
recommended that the batteries charge for 24 hours after installation or long-term storage.
NOTE If you installed power management software and optional EBMs, ensure maximum
battery runtime by using the ERM configuration tool on the Software Suite CD.
NOTE If more than two EBMs are installed, an external battery charger is recommended
for faster recharge times.
If you have questions about implementing non- or dual-redundant power,
the following options are available:
S
S
S
S
12
EATON Powerware
Plug the UPS power cord into a power outlet.
All front panel indicators flash briefly and then only the
flashes, indicating the UPS is in Standby mode with the equipment
offline. If the alarm beeps or a UPS alarm indicator stays on, refer to
"Troubleshooting" in the Powerware 5125 Two-in-One UPS
(2400–3000 VA) User's Guide.
Press and hold the On button until you hear the UPS beep
(approximately one second).
μ
The
indicator illuminates solid and the load level indicators
display the percentage of load being applied to the UPS. The UPS is
now in Normal mode and supplying power to your equipment.
www.oem.powerware.com/ibm-ups/pdf/nemadiagm.pdf or
www.oem.powerware.com/ibm-ups/pdf/iecdiagm.pdf
Submit your question to "Ask the Expert" at
www.oem.powerware.com/ibm-ups/
Submit your question to our FAQ database at
www.oem.powerware.com/IBM_faq/afmmain.asp
Contact the IBM office or Business Partner servicing your account
®
5125 (9910-P33) UPS Installation Guide for IBM
μ
®
S
Applications
164201634 Rev A
indicator
Tabla de contenido
loading

Este manual también es adecuado para:

9910-p33

Tabla de contenido