INSTALLATION INSTRUcTIONS
3 Mount the wiring plate to the wall or wallbox.
?
N O T E
The plugs and mounting screws required are supplied.
1
4 connect the RF Receiver wiring.
•
connect the H-LINK cable.
•
Place the cable through the orifice identified by marker 3.
•
connect the power cable (L = Live ; N =Neutral) (Tightening
torque 0.50 Nm)
•
Place the power cable in the cable guide identified by
marker 1.
5 The cables must be positioned in the box's cable guides in
order to guarantee the pull-off strength.
ATW-RTU-05
1~ 230V
L N
50-60Hz
<5A
L
N
6 Attach the cover of the RF receiver to the wiring plate.
7 Reconnect the mains power to the system.
1.4.1 Dimensional data
2
PMML0411A rev.0 - 03/2016
3
H-LINK
YUTAKI
YUTAKI
1 2
Terminal
Terminal
board
Board
H-LINK
98
80,79
1.4.2 Description of the parts
1.4.3 Technical data
•
Supply voltage: 230V/50Hz (30mA)
•
Wattage: 7W (maximum)
•
Dimensions (mm): 123 x 115 x 37
•
Weight (g): 214g
•
class 2 reinforced insulation device
•
Overvoltage category: class 2
•
Pollution category: class 2
•
Operating Temperature: 0°c to + 60°c
•
Operating Humidity: between 30% and 80%
•
Equipment protection rating: IP21
•
Maximum altitude for use: < 2000m
1.4.4 Communication
•
Radio
-
Radio frequency: 868MHz - 870Mhz
•
Yutaki H-Link:
-
communication line: Non-polar, twisted shielded pair
cable
-
communication system: Half-duplex
-
communication method: Asynchronous
-
Transmission Speed: 9,600 bauds
-
Wiring length: 1,000 m maximum (total length of H-LINK
I/O bus)
-
Maximum number of gateways : 1 H-LINK system
gateway
1.4.5 DSW configuration
Factory setting
In case of applying high voltage to the terminal 1-2 of TB
(Transmitting wires), the fuse on the PcB is cut. In such
a case, firstly correct the wiring to TB and then turn ON
switch 1 (as showin in the figure)
Operation / alarm LED
Wireless communication
Status LED
H-LINK communication
H-LINK connection
cable
Not used
Power cord