Installation; Site Preparation; Unpacking The Switch; Package Contents - Dell PowerConnect 7000 Serie Guia De Inicio Rapido

Ocultar thumbs Ver también para PowerConnect 7000 Serie:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 268

Installation

Site Preparation

PowerConnect 7000 Series switches can be mounted in a standard 48.26-cm
(19-inch) rack or left freestanding (placed on a flat surface) and function as
stand-alone switches.
Before installing the switch or switches, make sure that the chosen
installation location meets the following site requirements:
Power — The switch is installed near an easily accessible 100–240 VAC,
50–60 Hz outlet.
Clearance — There is adequate front and rear clearance for operator
access. Allow clearance for cabling, power connections, and ventilation.
Cabling — The cabling is routed to avoid sources of electrical noise such
as radio transmitters, broadcast amplifiers, power lines, and fluorescent
lighting fixtures.
Ambient Temperature — The ambient switch operating temperature
range is 0 to 45ºC (32 to 113ºF) at a relative humidity of up to 95 percent,
non-condensing.

Unpacking the Switch

Package Contents

When unpacking each switch, make sure that the following items are
included:
One PowerConnect switch
One AC power cable (two AC power cables for the PowerConnect 7048R)
One RJ-45 to DB-9 female cable
One rack-mount kit for rack installation (two mounting brackets, bolts,
and cage nuts)
One set of self-adhesive rubber pads for the free-standing switch (four pads
are included)
User Documentation CD
14
Getting Started Guide
Tabla de contenido
loading

Tabla de contenido