Uline H-8462 Guia De Inicio Rapido página 4

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

12. Attach preferred chain through slit on bottom of
boom extension and secure with an M14 x 80 mm
bolt, M14 washer and M14 hex nut. Tighten with
7/8" socket. (See Figure 13)
NOTE: The one-ton chain can only be used
at the 1/2 and one-ton boom positions. The
two-ton chain can be used at all boom
positions.
TO RAISE LOAD
• Turn release valve clockwise to a snug-tight
position. (See Figure 14)
NOTE: Do not overtighten.
NOTE: When the hydraulic floor crane is
unloaded, the boom can be raised to a
preferred position by turning the release
valve clockwise and pushing up on the
boom by hand.
Figure 14
PAGE 4 OF 12
ASSEMBLY CONTINUED
OPERATION
TO LOWER LOAD
• Turn release valve counterclockwise very slowly.
Speed is controlled by how much the release
valve is turned. (See Figure 14)
Handle
1-800-295-5510
uline.com
Release
Valve
Turn Counterclockwise
Jack
Figure 13
Release Valve
To Raise Load
Turn Clockwise
To Lower Load
0821 IH-8462
Tabla de contenido
loading

Tabla de contenido