7.
Insert legs into base. Secure each leg with two 4"
pins and two cotter pins. (See Figure 7)
NOTE: When legs are down, secure 4" pins and
cotter pins in first and third holes.
Figure 7
NOTE: When legs are folded, secure 4" pins
and cotter pins in first and second holes.
(See Figure 8)
Figure 8
4" Pins
8. Place hydraulic jack on upright and secure bottom
of jack with M16 x 90 mm bolt, M16 washer and
M16 hex locknut. Tighten with 15/16" socket.
(See Figure 9)
Figure 9
PAGE 3 OF 12
ASSEMBLY CONTINUED
9. Place boom on top of upright. Secure with
M18 x 120 mm bolt, M18 washer and M18 hex
locknut. Tighten with 1⁄" socket. (See Figure 10)
10. Raise hydraulic jack until top of hydraulic jack
aligns with boom. Secure with M16 x 90 mm bolt,
M16 washer and M16 hex locknut. Tighten with 15/16"
socket. (See Figure 11)
Side
View
11. Slide boom extension into boom. Secure at preferred
tonnage on boom with M16 x 90 mm bolt, M16
washer and M16 hex locknut. Tighten with 15/16"
socket. (See Figure 12)
Figure 10
Figure 11
Figure 12
NOTE: For instructions on how to raise/lower,
see Operation section on page 4.
0821 IH-8462