2. Insulate the screen, the electrical continuity conductor and the
remaining white and yellow wires of the bus cable (should a bus cable
with 4 conductors be used), which are not needed (figure D).
3. Insert the bus connector into the special feet of the device. The fastener
guides determine the direction it should be inserted. Insulate the bus
terminal using the relative cover, which must be screwed onto the
device.The cover guarantees that the power cables and the bus cables
are separated by at least 4 mm (figure F).
3.4
INITIALIZATION WITH THE EASY BASE UNIT
1. Power up the device through the bus.
2. Have the system acquire the device with one of the following
procedures:
• Automatic acquisition (the device still has the factory settings):
- select the "Application → New function" or "Application → Edit
function" menu in the Easy base unit: the device will be recognized
automatically.
• Manual acquisition (the factory settings have been modified):
- select the "Application → Search device" menu in the Easy base
unit;
- briefly press (< 2 seconds) the programming key. The programming
LED will light up during the acquisition process (figure A).
The device acquired by the Easy base unit will be listed, with the number
assigned, in the channels of the "Application → New function" or
"Application → Edit function" menus.
3.5
COMPLETING INSTALLATION
Insert the device into a Chorus support, making sure the potentiometer
edges are at the top.Complete the installation with other Chorus devices
or hole covers and fix it to the relative container (flush-mounted box,
wall-mounted box, etc.).
Apply the finish plate.
20