Finishing The Installation - HAMPTON BAY Scottsdale Manual Del Propietário

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

SUPPLY CIRCUIT
Ground
Conductor
Outlet Box
Light Switch
Green
Ground
Lead
Ground to
Downrod
WHITE
BLUE
BLACK
WHITE
Diagram indicates optional light kit wiring.
Figure 12
SUPPLY CIRCUIT
Light
Fan
WHITE
BLUE
BLACK
WHITE
Diagram indicates optional light kit wiring.
Figure 13

Finishing the Installation

1. Tuck connections neatly into ceiling outlet box.
Ground
2. Remove one screw from the mounting bracket
Conductor
and loosen the other screw around 1/4".
Outlet Box
3. Align the canopy up to ceiling and over the loose
screw. Place the canopy into key hole and rotate
Green
Ground
canopy clockwise. (Figure 14)
Lead
4. Secure the canopy by using previous removed
and loosened screw.
Ground to
5. Place the canopy cover to the canopy and rotate
Downrod
canopy cover clockwise until it is locked into right
position.(Figure 14)
WARNING
MAKE SURE TAB AT BOTTOM OF HANGER
BRACKET IS PROPERLY SEATED IN GROOVE OF HANGER
ATTACHING CANOPY TO BRACKET. FAILURE
TO PROPERLY SEAT TAB IN GROOVE COULD CAUSE
DAMAGE TO ELECTRICAL WIRING.
Outlet box
Mounting
bracket
Screw
Figure 14
BALL BEFORE
Lead Wires
Ball/Downrod
Assembly
Canopy
Canopy
cover
6

Capítulos

Tabla de contenido
loading

Tabla de contenido