Kohler MasterShower K-75 Instrucciones De Instalación página 7

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

4.
Remove cap from hose end for Rite-Temp mixer assembly.
Using thread sealant, connect hose to the top of the strainer.
Tighten 1/2 to 3/4-turn past hand tight. See Fig. #15 .
TB1 Plug
E. INSTALL HAND SHOWER:
1.
Refer to the Framing and Roughing-In diagram (Fig. #1 ) and
the separate Hand Shower Installation Instructions to install
the Hand Shower assembly at this time.
A distance of 4-5" (10.2-12.7cm) from either side of
the MasterShower tower to the hand shower slide bar is
recommended; however, actual hand shower slide bar
location is limited only by the length of the hand shower hose.
Mounting the slide bar to a wall stud is required.
2.
When hand shower installation is complete, connect the hand
shower hose to the fitting on the bottom end cap of the
MasterShower tower. Use thread sealant on the hose
connection. Tighten to 1/2 to 3/4-turn past hand-tight.
Water test tower assembly and connections for leaks
before closing tower assembly to mounting box.
Before turning on Rite-Temp valve with tower
assembly open, watch that direction of water flow will not
damage any materials.
When mixer is turned on, initial flow will be through
the hand shower. Electrical power is not required for basic
hand shower operation.
Turn Rite-Temp valve stem clockwise to open,
counterclockwise to close.
Kohler Co.
Strain Relief
Hose from
Manifold
Strainer
Rite-Temp
Mixer Assembly
Fig. #15
F. SET MAXIMUM TEMPERATURE:
The purpose of this procedure is to adjust the
maximum temperature setting of the Rite-Temp mixer valve.
This procedure does not limit the maximum water temperature
from the hot water source (water heater). To prevent possible
scalding, the hot water temperature should be adjusted at the
hot water source.
1.
See Fig. #16 . For minor water temperature changes, adjust
the setscrew.
2.
For significant water temperature changes, remove the
O-ring and collar from the valve stem.
3.
Rotate the valve stem clockwise until you achieve the desired
maximum water temperature.
4.
Re-install the collar on the valve stem with the setscrew
against the side of the tab.
5.
Re-install the O-ring.
6.
Rotate the valve stem counterclockwise to shut the water off.
Setscrew
Collar
G. INSTALL HANDLE TRIM AND HANDLE:
1.
Close tower assembly to mounting box: Lift up tower and slide
in to close. Watch to make sure all hoses are out of the way.
2.
Rite-Temp valve control stem should align inside handle hole
of tower assembly. Snug up tower assembly against wall.
3.
See Fig. #17 . Center seal over valve stem. Center flange
over valve stem. Align sleeve with grip ring over valve stem.
Secure with supplied #8-32 x 7/8" screw.
4.
Snap cap assembly into place over sleeve. Slide second grip
ring over cap assembly.
7
Tab
O-Ring
Valve Stem
Fig. #16
Seal
Rite-Temp Handle
Screw
Grip Rings
Cap and Button
Assembly
Fig. #17
1017708-2-
A
Tabla de contenido
loading

Tabla de contenido