Kohler MasterShower K-75 Instrucciones De Instalación página 5

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Risk of damage to mounting box.
solder inside mounting box.
4.
See Fig. #8 . Check fit of mounting box in opening. Tilt bottom
of mounting box into hole in finished wall so that supply risers
pass through holes in mounting box and force down and into
position. It may be necessary to pull risers slightly forward to
align with holes in mounting box. After checking fit, remove
mounting box.
5.
See Fig. #9 . Secure 24" (61cm) of SJO cord from
transformer enclosure with strain relief bushing supplied.
24"
(61cm)
6.
Apply adhesive sealant around back of mounting box lip.
Perform Steps 7. and 8. immediately since sealant sets up in
minutes.
7.
Tilt bottom of mounting box into hole in finished wall so that
supply risers pass through holes in mounting box and force
down and into position. (See Step 4.)
Kohler Co.
Finished
Wall
Mounting
Box
Fig. #8
Wall Mount Box
SJO Cord from
Transformer
Apply Sealant
Fig. #9
8.
Align mounting box so it is plumb and so back of box mounting
Do not
flange is flush with finished wall. Drill 9/64" pilot holes through
finish wall material and into cross members. With some wall
hard materials, it may be necessary to drill a wider initial hole
to provide screw shank clearance. Secure mounting box with
the 2" stainless steel Phillips head screws provided. (Note:
Six screws are required: eight screws are supplied). See
Fig. #10 .
Level
9.
Slide one cone bushing (cone up) over each riser. Secure
bushing in mounting box opening.
10.
Wrench tighten coupling nuts on hoses. See Fig. #11 . Some
adjustable wrenches may not clear space between coupling
nuts. Use a 15/16" open end wrench.
5
Supplied Screw
Drill Motor
Finished Wall
Fig. #10
Box
Connector
Cone Bushing
Fig. #11
1017708-2-
A
Tabla de contenido
loading

Tabla de contenido