Installation And Connection; Installation Site Requirements; Connecting The Gas Line - Bühler technologies Denox-MB Manual Del Usuario

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 17
Denox-MB
3 Transport and storage
The device should be only transported in the original case or
in appropriate packing.
CAUTION
Transport
Transport the product in a way which is not damaging to
health. Where necessary, use auxiliary means for transport
and assembly.
Avoid damage to the product. Treat the product with caution.
Ensure that the product is fastened with wall brackets which
comply with DIN EN 61010-1.
If the device is not used for some time, protect it against heat
and humidity. Store the device in a roofed, dry, and dust free
room. Temperature should be between -20 °C and 60 °C (-4 °F
and 140 °F).

4 Installation and connection

4.1 Installation site requirements

Sample gas probes are intended for flange mounting. The GFP
protective housing should be secured by the fastening clips.
• Installation site and installation position are determined
based on requirements specific to the application.
• If necessary, the connection piece should be slightly tilted
toward the centre of the channel.
• Installation site must be protected from the elements and
should provide protection against sun and rain.
• In addition, adequate and safe access for installation and
future maintenance work should be provided. Particularly
follow the uninstalled size of the probe tube!
• Never over- or underrun the approved ambient temperat-
ure range (T
) of -20 °C to +50°C. The ambient temperat-
amb
ure upper limit varies by inlet dew point and gas compos-
ition.
• Protect from shock and impact.
If the probe is transported to the installation site in pieces, it
will first need to be assembled.
4.2 Installing the sampling tube (optional)
The sampling tube, if necessary with the fitting extension,
must be screwed in. The probe is then attached to the mating
flange using the included seal and nuts.
8
Bühler Technologies GmbH
4.3 Installing the downstream filter
NOTICE
The downstream filter and the O-ring for the handle must be
inserted prior to first startup.
Operating without downstream filter prohibited!
O-ring handle
4.4 Insulation
On heated probes completely insulate any exposed flange
areas and, if applicable, the connection piece to absolutely
prevent thermal bridges. The insulating material must meet
the application requirements and be weatherproof.

4.5 Connecting the gas line

This table provides an overview of the sample gas probe con-
nections:
Connecting flange:
DN65 PN6 oder ASME DN4"-150
Sample gas input:
G3/4
Sample gas outlet:
GL14 (6 mm)
Test gas connection:
Tube ø6 mm or ø1/4"
Condensate outlet:
DN4/6
1)
Gasket inside diameter
Carefully and properly connect the sample gas line to the gas
outlet of the Glass pearl receptacle. Please see the drawing be-
low for the fundamental layout of the gas connection:
Glass
PTFE
Attach an O-ring suitable
for the expected ambient
temperature to the handle.
Attach the downstream fil-
ter to the handle. Then
carefully insert the handle
with filter in the gas probe
and turn 90° to secure.
Verify the handle is seated
correctly. When seated cor-
rectly it locks onto the filter
housing.
1)
BX460034 ◦ 01/2021
Tabla de contenido
loading

Tabla de contenido