Tools Needed; Materials Needed - Bosch SHI Instrucciones De Instalación

Ocultar thumbs Ver también para SHI:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

TOOLS NEEDED

Hammer
Tape Measure
Wire Cutter

MATERIALS NEEDED

(Additional materials may be required to comply with local codes.)
Electrical Supply Cable - Minimum #14 AWG, 2 conductor, 1 ground, insulated copper
conductors.
Hot Water Supply Line - Minimum 3/8" O.D. copper tubing or metal braided dish-
washer supply line.
Shut-off valve and fittings appropriate for hot water supply line (copper tubing/compres-
sion fitting, or braided hose).
90° elbow with 3/8" N.P.T. male threads on one leg, and sized to fit your water supply
line (copper tubing/compression fitting, or braided hose) on the other leg.
Teflon tape or other pipe thread compound to seal plumbing connections.
UL listed conduit connector or strain relief.
2
Tools and Materials Needed
Hole Saw
Slot Screwdriver
Wire Stripper
Pipe Wrench
Phillips Screwdriver
Drill
Adjustable Wrench
Torx Screwdriver
Level
Tabla de contenido
loading

Este manual también es adecuado para:

ShwShy66Shx99a

Tabla de contenido