Finishing The Installation - Kichler LUCIAN Manual De Instrucciones

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

FINISHING THE INSTALLATION

Step 1. Tuck all the connections neatly into the ceiling outlet box.
Step 2. Slide the canopy up to the mounting bracket and place one of the
key hole slots over the mounting screw on the mounting bracket. Rotate the
canopy until the screw head locks in place at the narrow section of the key
hole. See figure 15.
Step 3. Align the remaining circular hole on the canopy with the remaining
hole on the Ceiling Mounting Bracket. Insert and tighten the mounting screw
you removed earlier and the mounting screw from Step 2 above. Now, attach
the canopy cover to the mounting screw heads by inserting the screw heads
into the bottom side of the canopy cover and rotating the cover clockwise.
NOTE: Adjust the canopy screws as necessary until the canopy and canopy
cover are snug. (Fig. 15)
WARNING: Make sure the "Check Tab" at the bottom of the hanger bracket
is properly seated in the "Registration Slot" on the side of the hanger ball
before attaching the canopy to the bracket. Failure to properly seat the
"Check Tab" could damage the electrical wires.
Outlet box
Ceiling
mounting
bracket
Screws
Canopy
Screws
Canopy cover
Fig. 15
52" LUCIAN
LED | 13
TM
Tabla de contenido
loading

Tabla de contenido