Installation And Mounting; Selecting The Assembly Location - SICK UE4215 Manual De Instrucciones

Ocultar thumbs Ver también para UE4215:
Idiomas disponibles
  • ES

Idiomas disponibles

Operating Instructions
UE4215
4

Installation and mounting

8010654/TF83/2010-07-20
Subject to change without notice
Installation and mounting
This chapter describes the preparation and completion of the installation of the safe bus
node UE4215. The installation and mounting requires the following steps:
Selection of a suitable assembly location (cf. chapter 4.1 "Selecting the assembly
location")
Mounting on a base with functional earthing (cf. chapter 10.2 "Accessories"), if the
ESPE connected requires functional earthing
4.1

Selecting the assembly location

The safe bus node UE4215 is a decentral component. Select a suitable assembly location
on the basis of the following criteria:
Mounting position in the immediate vicinity of the hazardous point to be protected
Short cable paths to the components to be connected
Flat assembly surface to enable the housing to be assembled without becoming
distorted
Diagnostic LEDs of the device visible, simple device exchange
Protected in order to prevent any removal or breakage of the connecting wires by
personnel or the device
Sufficient space for the plug connections
With respect to vibrational and impact load, temperature and humidity, suitable in
accordance with the data in chapter 9 "Technical specifications".
© SICK AG • Industrial Safety Systems • Germany • All rights reserved
GB
Chapter 4
93
loading