EN 60947-5-1-3
Installation Instructions for the Dual Entry Key Operated Safety Interlock Switch (GK Series)
Instrucciones de instalación para el interruptor de seguridad con llave de doble entrada (serie
GK)
Einbauanweisungen für den Doppeleingangs-Sicherheits-Verriegelungsschalter mit separatem
Betätiger (Serie GK)
Instructions d'installation de l'interrupteur de sécurité avec interverrouillage à clé à double
entrée (série GK)
Istruzioni per l'installazione dell'interruttore con interblocco di sicurezza azionato a chiave a
doppio ingresso (Serie GK)
Instruções de Instalação para o Switch de Bloqueio de Segurança Operado por Chave de Duas
Entradas (Série GK)
이중입구 키동작 안전 인터록 스위치(GK 시리즈) 설치설명서
WARNING
IMPROPER INSTALLATION
• Consult with local safety agencies and their
requirements when designing a machine-control link,
interface and all control elements that affect safety.
• Strictly adhere to all installation instructions.
Failure to comply with these instructions could result
in death or serious injury.
MOUNT, WIRE, SEAL AND TEST SWITCH
WARNING
IMPROPER OPERATION
• Ensure key travels to the given minimum insertion
distance to ensure switch contact transfer.
• Ensure key travels to maximum extraction distance to
ensure correct operation of the positive break
mechanism.
• Do not exceed 100 N [22.4 lb] actuation force.
• Do not use the key as a stop for the door.
Failure to comply with these instructions could result
in death or serious injury.
1. Refer to:
• Page 6 for wiring configurations and switch mounting
dimensions.
• Page 7 for specifications.
• Pages 8-10 for key mounting dimensions.
2. Rotate head (if desired):
®
• Using the TORX
tamper resistant bit (included),
loosen tamper-proof screws and remove head.
• Rotate head to desired position (90° increments),
ensuring seal remains in correct position while
reassembling head.
• Torque tamper-proof screws 1,36 Nm to 1,80 Nm
[12 in-lb to 16 in-lb].
3. Ensure proper clearance for switch and key at
mounting location.
4. Align switch and key together before mounting.
5. Mount switch and key:
• Torque switch to mounting surface: 4,9 Nm to 5,9 Nm
[43 in-lb to 52 in-lb] using M5 or #10 screws.
• Torque key to mounting surface: 4-2,8 Nm [21 in-lb to
25 in-lb] using M5 or #10 screws.
Sensing and Productivity Solutions
6. Refer to circuit diagram on switch housing. Diagram
depicts safety switch when key is inserted.
7. Remove tamper-proof screws on cover plate.
8. Connect stranded wire (0,75 mm
18-14 AWG) or solid wire (0,75 mm
AWG) to connector terminals (use 90 °C wire when
ambient temperature is over 75 °C):
• Torque connector to secure cable to switch enclosure
(if required): 1,8 Nm to 2,2 Nm [16 in-lb to 19 in-lb].
• Torque switch terminal screws: 0,8 Nm to 1,0 Nm [7
in-lb to 9 in-lb] M3.
• Torque ground screw: 0,8 Nm to 1,0 Nm [7 in-lb to 9
in-lb] M3.
9. Seal conduit opening according to instructions in PK
80112.
10. Reassemble cover plate, and torque cover screws to
0,5 Nm [4.4 in-lb].
11. Plug unused key entry window with snap fit cover
(included).
12. Perform functional tests:
• Open and close protective guard several times to
ensure key slides easily into switch head.
• Open and close protective guard several times to
ensure switch contacts transfer (change state) in
each state.
• Ensure the normally closed contacts open when
protective guard is open.
• Ensure hazardous motion does not start when
protective guard is open.
ADVERTENCIA
INSTALACIÓN INCORRECTA
• Consulte las normas de seguridad y sus requisitos al
realizar el diseño del enlace de control de una máquina,
la interfaz, y los elementos de control que afecten a la
seguridad.
• Siga estrictamente todas las instrucciones para la
instalación.
El incumplimiento de estas recomendaciones puede
ocasionar lesiones graves o peligro de muerte.
Issue 10
PK 80109
2
to 2,5 mm
2
,
to 1,5 mm
, 18-16
2
2