Installation Procedures - TANDD Terminator ZP Guia De Inicio Rapido

Terminator
Kit Contents . . .
1
2
3
Item
Quantity
Expediter Assembly
Support Cap with O-Ring
1
1
Threaded Grommet Compressor
Grommet
Support Base with O-Ring
2
1
Junction Box Lid
3
1
Junction Box Base with O-Ring
4
1
Nut
5
1
Banding
6
1
Banding Guide
Terminal Blocks with DIN Rail
7
1
(Refer to terminal specifications for maximum
allowable wire size)
8
1
Junction Box Cord
9
1
Power Gland
10
1
Blind Plug
Order Separately . . .
PETK Power and End Termination Kits (per cable)
PETK-1
for RSX, TSX, VSX, BSX
PETK-2
for BSX, KSX, HTSX
PETK-3
for HPT, FP
1
3
2
4
Item
Quantity
1
1
RTV Tube (per cable)
2
1
Power Connection Boot
3
2
Conductor Wire Pins (per cable)
4
1
Brad Wire Pin (per cable)
5
1
Ground Sleeve (per cable)
ZP
TM
4
5
6
7
8
9
10
Description
5
Description

INSTALLATION PROCEDURES

Dimensions . . .
Tools Required . . .
3 mm
8 mm
Certifications/Approvals . . .
IP66 -60°C ≤ Ta ≤ +55°C
Ordinary & Hazardous Locations
IECEx FMG 10.0022X Ex eb IIC T4-T6, Ex tb IIIC T135°C-T85°C
1725
II 2 GD Ex eb IIC T4-T6, Ex tb IIIC T135°C-T85°C FM 10ATEX0058X
Warnings . . .
• Due to the risk of electrical shock, arcing and fire caused by
product damage or improper usage, installation or mainte-
nance, a ground-fault protection device is required.
• Installation must comply with Thermon requirements (in-
cluding form PN 50207U for Ex systems) and be installed
in accordance with the regulations as per the norm EN IEC
60079-14 for hazardous areas (where applicable), or any
other applicable national and local codes.
• Component approvals and performance ratings are based
on the use of Thermon specified parts only.
• De-energize all power sources before opening enclosure.
• Keep ends of heating cable and kit components dry before
and during installation.
• Minimum bending radius of heating cable is 32 mm (except
HPT is 57 mm and FP is 19 mm).
2
Terminator-LN-Tool
(order separately)
28 mm
29 mm
33 mm
loading