Terminator INSTALLATION PROCEDURES Kit Contents . . . Dimensions . . . Item Quantity Description Expediter Assembly Support Cap with O-Ring Tools Required . . . Threaded Grommet Compressor Grommet Terminator-LN-Tool Support Base with O-Ring (order separately) Junction Box Lid 3 mm 28 mm 8 mm...
Página 3
Terminator INSTALLATION PROCEDURES Insert cable into expediter. If mounted on bot- Slide expediter toward pipe and route cable Locate bus connection (HPT and FP only) and tom or side of pipe, punch out weep hole. through support base entry. cable as shown. Cut end of cable at angle to aid in piercing grommet.
Página 4
Terminator INSTALLATION PROCEDURES Install M25 power gland and M25 blind plug. Install M25 power gland and M25 blind plug. Install quick mount terminal blocks and tighten For in-line splice, T-splice, or end termina- For in-line splice, T-splice, or end termina- screws (if necessary).
Terminator INSTALLATION PROCEDURES Three Cable Layout Tips Locate bus connection (HPT and FP only) and Insert three cables into expediter. Mount expediter with three cables. Do not cable as shown. Cut end of cable at angle to band over cable. aid in piercing grommet.
Página 6
15. Utiliser le tourne vis pour bloquer le couvercle (rotation d’environ 30 degrés) Terminator ZP-XP para la utilización con cables calefactores autorregulantes RSX, TSX, VSX, BSX, HTSX, KSX, de potencia limitante 16. La sécurité de blocage est complètement engagée. Pour ouvrir le boîtier répéter 14 & 15 mais dans l’autre sens de rotation A1.
Página 7
THERMON . . . The Heat Tracing Specialists ® www.thermon.com European Headquarters Corporate Headquarters Tel: +44 (0)191 490 1547 • • For the Thermon office nearest you Boezemweg 25 PO Box 205 100 Thermon Dr. PO Box 609 Fax: +44 (0)191 477 5371 •...