READ RAFIX ATTACHMENT SYSTEM INSTRUCTIONS NOW.
FIG. 2
JJ x18
FIG. 3
KK x18
PAGE 4 – 772W & 784W
2. Tap in Rafix Cams (JJ), with notch
facing the edge:
• 7 in the Top Shelf (DD)
• 7 in the Bottom Shelf (EE)
• 4 in the Center Shelf (CC)
3. Screw Rafix Bolts (KK)
• 6 in the Right Side Panel (AA)
• 6 in the Left Side Panel (BB)
• 3 in the Base (HH)
• 3 in the Crown Moulding (GG)