Kohler K-8013 Guía De Instalación Y Cuidado página 3

Ocultar thumbs Ver también para K-8013:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Multiple Bodyspray Installation
Water
Supply
Pressure Balancing Loop
1. Install the Supply Piping
Multiple Bodyspray Installations
Route the water supply lines.
If installing more than one bodyspray off the same supply line,
construct a pressure balancing loop. Locate a tee along the loop at
each bodyspray installation location.
Do not strap the pipes at this time.
Single Bodyspray Installations
Route the water supply line.
Install an elbow to the end of the supply pipe at the bodyspray
installation location.
All Installations
Temporarily install a nipple to each tee/elbow. Do not use any
sealant.
Do not strap the pipes at this time.
Kohler Co.
Single Bodyspray Installation
Nipple
3
Nipple
1080947-2-D
Tabla de contenido
loading

Este manual también es adecuado para:

K-77119K-8014

Tabla de contenido