Operational Test And Start-Up Diagnostics - Watts TRITON TRCU1 Guía Del Usuario & Manual De Instrucciones

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

All manuals and user guides at all-guides.com
Equipment Setup & Usage Instructions

Operational Test and Start-up Diagnostics

NOTICE
BEFORE plugging Power Cord into
electrical outlet (receptacle) make
sure power (On/Off) switch is in Off
position.
STEP 1
Turn on Control Unit
110/120VAC electrical outlet (receptacle).
"Fuser Found!"
Error" alternating with "Check Fuser and
Cable Connection" then double check the
connections to ensure they are secure.
calibration. If the display reads "Please
Close Fuser Jaw" then close the Fuser
jaws by depressing fuser lever tongue.
tion process starts.
STEP 2
Calibrate Fuser
approximately 2 seconds and release.
This allows the Control Unit to recognize
the Fuser's size and profile.
ready button will turn green. When
ready the Control Unit display will read
"Fuser Ready to Start" alternating with
"Assemble Fitting & Attach Fuser."
12
-
Fuser Button
A
Tabla de contenido
loading

Tabla de contenido