Pre-Energizing Inspection; Energizing - Tripp-Lite SUT40KMBP Manual De Instalación Y Operación

Panel de derivación para mantenimiento
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

7. Installation
Using the appropriate tools, strip a length of insulation from the end of the cable sufficient to fit into the full length of the mechanical lug
for the designated connection point. If using aluminum conductors, apply an appropriate antioxidant compound to the bare aluminum.
Insert the bare conductor into the lug so the bare conductor fills the full length of the mechanical lug body. Tighten the set screw on the
mechanical lug and torque to the values indicated on the Torque Values Label located on the equipment.
Reference the Equipment Schematic Drawing for information on the required connections between the Maintenance Bypass Panel, the UPS
and the critical load.

7.2.4 Pre-Energizing Inspection

Inspection and maintenance should only be performed on equipment that has been de-energized and electrically isolated so that no
accidental contact can be made with energized parts.
Before energizing the equipment, it must be thoroughly inspected.
1. Remove any foreign materials from inside of the equipment including tools, scraps of wire or other debris.
2. Visually inspect the equipment for any damage that may have occurred during the installation process. Be sure to inspect all insulators,
busbars and other conductors. Do not energize if any damage is found!
3. Verify cable phase orientation at all connection points.
4. Verify all field cable connections are properly torqued.
5. Manually operate all switches to verify proper operation.
6. Verify equipment ground connections are properly terminated.
7. Review the bypass operating sequence prior to actuating the switches.
8. Verify all covers are installed.

7.2.5 Energizing

Hazardous voltages in electrical equipment can cause severe injury or death!
Only qualified persons should attempt to install or service this equipment. A qualified person is one who has skills and knowledge
related to the construction and operation of electrical equipment and installations and has received safety training on the hazards
involved.
Ensure maximum continuous loads do not exceed 80% of the overcurrent protective device (switches and fuses) ratings employed in
other than motor circuits, except for those circuits employing circuit breakers marked as suitable for continuous operation at 100% of
their ratings.
Extreme hazards can exist when energizing electrical equipment. Take all precautions necessary to protect people and property when
energizing this equipment. Before energizing the equipment, open/turn off all switches. Refer to the UPS manual for proper startup
procedures.
5
Tabla de contenido
loading

Este manual también es adecuado para:

Sut60kmbp

Tabla de contenido