Federal Signal FB2PST Hoja De Instrucciones página 5

Idiomas disponibles

Idiomas disponibles

9. Before replacing dome, ensure that the gasket is properly seated on the die-cast base. Place
the dome over the base, aligning the recesses inside the dome lip with the four pins on the
base. Push down on the dome and turn clockwise until it locks in place (approximately 3/4-
inch).
10.
Replace the screw in the bottom of the dome.
11.
Reassemble the light and test for proper operation.
C. Service.
The Federal factory will service your equipment or provide technical assistance with any
problems that cannot be handled locally.
Any units returned to Federal Signal for service, inspection, or repair must be accompanied by
a Return Material Authorization. This R.M.A. can be obtained from the local Distributor or
Manufacturer's Representative.
At this time a brief explanation of the service requested, or the nature of the malfunction,
should be provided.
Address all communications and shipments to:
FEDERAL SIGNAL CORPORATION
Electrical Products Division
Service Department
2645 Federal Signal Drive
University Park, IL 60466-3195
D. Replacement Parts.
Description
Dome, Amber, Kit
Dome, Blue, Kit
Dome, Clear, Kit
Dome, Green, Kit
Dome, Red, Kit
Dome, Magenta, Kit
Flash Tube/Trigger Coil Assy.
Fuse, 120 and 230-240 VAC units,
1A, 250V
Circuit Board, 12-24VDC
Circuit Board, 120VAC
Circuit Board, 230-240VAC
Circuit Board, Inrush Current, 24VDC
Part Number
K8550320A
K8550320A-01
K8550320A-02
K8550320A-03
K8550320A-04
K8550320A-05
K8107177A
K148A155A-01
K2001202C
K200D866G
K200D866G-01
K2001918A
-4-
loading

Este manual también es adecuado para:

Fb2pst-i