Kohler K-8501 Manual De Instrucciones página 4

Ocultar thumbs Ver también para K-8501:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Handshower
Head
2. Installation Checkout
Complete the installation of the valve, valve trim and any other
components according to the instructions packed with the
product.
Ensure all connections are tight.
Open the drain.
Turn on the main water supply and check for leaks. Repair as
needed.
Open both hot and cold valves and run water through the spout
(if installed) to remove debris. Check for leaks.
Check the handshower for smooth operation.
Turn the valves to the closed position.
1016116-2-C
Outer
Ring
4
Kohler Co.
Tabla de contenido
loading

Este manual también es adecuado para:

K-8502K-8543K-8503K-16161K-16162K-16163

Tabla de contenido