SECTION 6 - INITIAL BREAK-IN MAINTENANCE
GENERAL MAINTENANCE
Perform the following maintenance checks after the initial break in peroid.
1. Engine RPM is adjusted to: 4,000 - 4,100 min
(4,000 - 4,100 rpm ) (With load ).
-1
2. Check Bolts and Nuts for looseness. Tighten it if necessary.
3. Check for fuel and oil leak.
4. Keep the RUBBER BUFFER away from oil and fuel.
5. Please refer to "INSTRUCTION FOR USE" for ROBIN engine EH09D regarding the how-to maintenance for engine.
6-2
DISTRIBUIDO EN EL PERÚ POR SOKMAQ S.A.C.