Selecta L-3 Manual De Instrucciones página 10

Destilador
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

INSTRUCTION MANUAL CODE 80140 REV C
J
.P. SELECTA s.a.u.
OPERATION
Before starting, check that the water level is over the heating element
(15) and then pour the surplus from the tube (19) towards the nearest
drain tube.
Once the distiller is plugged onto the mains, push the switch (12) on to
start the unit. A green light indicates that the distiller is ready for distilling.
When the water tap (1) is opened, distillation starts. If the amber light
is on, it means that there is not enough water pressure. Open the tap
at maximum to get more pressure. If the tap is already at maximum, it
means that the installation is not suitable for the distiller.
After ten minutes, the boiling and distillation starts.
Distilled water gets out from the tube (18).
1-
Tap.
2-
Upper tube thread.
4-
Inferior tube thread.
5-
Water entry.
6-
Feed tube.
7-
Refrigerant.
8-
Level.
10-
Glass part.
12-
Switch on/off.
14-
Furniture base.
15-
Heater element.
16-
Steam trap.
17-
Steam way out.
18-
Distillate tube.
19-
Drain tube.
20-
Cleaning orifice.
22-
Level orifice.
Autovía A-2 Km 585.1 Abrera 08630 (Barcelona) España
e-mail: [email protected] - website: www.jpselecta.es
06/2020
Tel (34 3) 770 08 77 Fax (34 3) 770 23 62
Page: 10
Tabla de contenido
loading

Este manual también es adecuado para:

4903000

Tabla de contenido