Operating Programme - Riello RDB2.2R BG Instrucciones De Instalación, Montaje Y Funcionamiento

Quemadores de gasóleo
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

6.10 Operating programme

Normal operation
POWER SUPPLY
Green
blink
Flame loss during operation (Recycle: max. 3 attempts)
Green
blink
20076737
Lockout due to extraneous light during pre-purging
POWER SUPPLY
P
H T
P H
K
t
1
t
2
F M
M
I D
V 1
F
Green
blink
L E D
20094184
Start-up, calibration and operation of the burner
Green blink
Orange
blink
Green
Green blink
Orange
blink
Green
Signal not requested
20083033
t
s
t
l
Lockout
3
Orange blink
Red, green blink
Red
Lockout due to ignition failure
POWER SUPPLY
D11374
Lockout
Key (Fig. 17 - Fig. 18 - Fig. 19)
F
Flame detector
HT
Heat request thermostat
ID
Ignition device
K
Enabling switch thermostat for start up after preheating
FM
Fan motor
Fig. 17
PH
Heater
V1
Oil valve
LED
Reset button LED colour
t1
Standby time
t2
Time for checking initialisation
t3
Pre-purging time
t3i
Pre-ignition time
t3l
Checks for extraneous light during pre-purging
t4i
Total ignition time
t4l
Reaction time to achieve safety shut-down due to flame
failure
t5i
Post-ignition time
tpp
Post-purging time
ts
Safety time
Fig. 18
18
GB
Orange
Green
blink
blink
Lockout
Green
blink
Red
Fig. 19

Capítulos

Tabla de contenido
loading

Este manual también es adecuado para:

200917502009175120091752

Tabla de contenido