Energy 19532-000 Manual De Usario página 4

Luz en carril decorativa de 6 cabezales
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

PREPARATION
Before beginning assembly of product, make sure all parts are present. Compare parts with
package contents list and hardware contents. If any part is missing or damaged, do not attempt to
assemble the product.
Estimated Assembly Time: 45 minutes
Tools Required for Assembly (not included): Wire stripper, Phillips screwdriver, Electrical tape, Drill,
7/32 in. drill bit, measuring tape, ladder and pencil.
Helpful tools (not included): Gloves
ASSEMBLY INSTRUCTIONS
1. Unscrew screws (C) from power feed stem (B) and
detach preassembled mounting bracket (A). Then, attach
mounting bracket (A) to junction box (not included) with
junction box screws (AA).
Hardware Used
Junction
AA
Box Screw
2. Connect the wires from power feed stem (B) to the supply
wires from the junction box -- white to white, black to black
and green/ground to green/ground. Attach wire connectors
(DD) to wire connections, then wrap connections with
electrical tape (not included)
Push wire connections into junction box, then re-attach
power feed stem (B) to mounting bracket (A) using
previously removed screws (C)
Hardware Used
BB
Wire Connector
3. Unscrew preassembled bushing from the support
stem nuts on the adjustable arms of fixture
assembly (B). Save for later use.
Determine the desired locations of the support stems (F).
Note: Maintain a minimum of 14 inches between each
support stem; refer to Step 10 on page 6 for light
configuration options.
Mark locations, then use 7/32 in. drill bit (not included) to
drill holes at marked locations. Install plastic anchors (DD)
into holes, then secure previously removed bushings to the
plastic anchors (DD) with wood screws (CC).
Re-attach support stems (F) into bushings.
Hardware Used
CC
Wood Screw
DD
Plastic Anchor
x 2
x 3
x 4
x 4
4
1
A
AA
2
BB
B
3
DD
F
A
C
CC
Tabla de contenido
loading

Tabla de contenido