Rotex RRLQ011CAV3 Manual De Instalación página 25

Unidad exterior para bomba de calor de aire-agua
Ocultar thumbs Ver también para RRLQ011CAV3:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 104
RRLQ011CAV3+W1
RRLQ014CAV3+W1
RRLQ016CAV3+W1
C
ONTENTS
1. Definitions .................................................................................. 1
1.1.
Meaning of warnings and symbols ................................................. 1
1.2.
Meaning of used terms................................................................... 2
2. Safety considerations................................................................. 2
Warning .......................................................................................... 2
Caution ........................................................................................... 3
3. Before installation ...................................................................... 3
3.1.
Scope of the manual ...................................................................... 3
3.2.
Precautions for R410A ................................................................... 3
3.3.
Installation ...................................................................................... 4
3.4.
Model identification......................................................................... 4
3.5.
Accessories .................................................................................... 4
3.6.
Handling ......................................................................................... 4
4. Overview of unit ......................................................................... 4
4.1.
Opening the unit ............................................................................. 4
4.2.
Main components ........................................................................... 5
4.3.
Functional diagram RRLQ_V3+W1 ................................................ 6
5. Selecting installation site............................................................ 7
5.1.
General........................................................................................... 7
5.2.
Selecting a location in cold climates............................................... 8
6. Precautions on installation ......................................................... 9
6.1.
foundation work .............................................................................. 9
6.2.
7. Installation servicing space........................................................ 9
8.1.
Selection of piping material .......................................................... 10
8.2.
Refrigerant pipe size .................................................................... 10
8.3.
Allowable pipe length and height difference ................................. 10
9. Precautions on refrigerant piping ............................................. 10
9.1.
Flaring guidelines ......................................................................... 10
9.2.
Brazing guidelines ........................................................................ 11
9.3.
Stop valve operation..................................................................... 11
Cautions on handling the stop valve ............................................ 11
Opening/closing the stop valve .................................................... 11
Cautions on handling the stem cap .............................................. 12
Cautions on handling the service port.......................................... 12
9.4.
Tightening torques........................................................................ 12
10. Refrigerant piping..................................................................... 12
10.1. Preventing foreign objects from entering...................................... 12
regarding insulation ...................................................................... 12
10.3. Cautions for necessity of a trap.................................................... 13
11. Leak test and vacuum drying ................................................... 13
11.1. General guidelines ....................................................................... 13
11.2. Setup ............................................................................................ 13
11.3. Leak test....................................................................................... 13
11.4. Vacuum drying ............................................................................. 14
12. Charging refrigerant ................................................................. 14
12.2. Precautions and general guidelines ............................................. 14
12.4. Complete recharging .................................................................... 15
13. Pump down operation .............................................................. 15
14. Electrical wiring work ............................................................... 15
14.1. Precautions on electrical wiring work ........................................... 15
14.4. Electrical characteristics............................................................... 17
RRLQ011~016CAV3+W1
Outdoor unit for air to water heat pump
4PW57794-1 - 10.2010
Outdoor unit for air to water heat pump
15. Test operation...........................................................................17
Page
15.1. Pre-run checks ............................................................................. 17
15.2. Test run ........................................................................................ 17
16. Maintenance and servicing ......................................................18
16.1. Service precautions...................................................................... 18
16.2. Service mode operation ............................................................... 18
17. Disposal requirements..............................................................18
18. Unit specifications ....................................................................18
18.1. Technical specifications................................................................ 18
18.2. Electrical specifications ................................................................ 18
19. Wiring diagram .........................................................................19
Thank you for purchasing this product.
The original instructions are written in English. All other languages
are translations of the original instructions.
CAREFULLY READ THESE INSTRUCTIONS BEFORE
INSTALLATION. THEY WILL TELL YOU HOW TO INSTALL
AND HOW TO CONFIGURE THE UNIT PROPERLY.
KEEP THIS MANUAL IN A HANDY PLACE FOR FUTURE
REFERENCE.
1. D
EFINITIONS
1.1. Meaning of warnings and symbols
Warnings in this manual are classified according to their severity and
probability of occurrence.
DANGER
Indicates an imminently hazardous situation which, if not
avoided, will result in death or serious injury.
WARNING
Indicates a potentially hazardous situation which, if not
avoided, could result in death or serious injury.
CAUTION
Indicates a potentially hazardous situation which, if not
avoided, may result in minor or moderate injury. It may also
be used to alert against unsafe practices.
NOTICE
Indicates situations that may result in equipment or
property-damage accidents only.
This symbol identifies useful tips or additional information.
Some types of danger are represented by special symbols:
Electric current.
Danger of burning and scalding.
Installation manual
Installation manual
1
Tabla de contenido
loading

Este manual también es adecuado para:

Rrlq014cav3Rrlq016cav3Rrlq011caw1Rrlq014caw1

Tabla de contenido