Pentair INTELLIBRITE 5G LIGHT Guía De Usuario página 8

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

4
9. Connect the three light wires to the corresponding light circuit wires
in the Junction Box. Connect the black wire to power, white wire to
common, and the green wire to ground.
10. Secure the Junction Box cover.
11. Install the IntelliBrite
insert the TAB on the lower part of the face ring into the niche SLOT
(located on the lower part of the niche). This is important to secure
the lower part of the light assembly onto the niche before tightening
the pilot screw.
12. Carefully tighten the special bronze pilot screw to secure the upper
part of the light assembly onto the niche.
underwater light. This screw mounts and electrically grounds the housing
securely to the mounting ring and wet niche. Failure to use the screw
provided could create an electrical hazard which could result in death or
serious injury to pool users, installers or others due to electrical shock.
13. Final check for proper IntelliBrite light operation: Switch on
the main switch or circuit breaker to the system, and the switch
that operates the IntelliBrite underwater light itself. The light should
illuminate when power is applied. If not recheck the installation
steps starting with Step 1 (page 3).
INTELLIBRITE
5G Pool and Spa Lights Installation and User's Guide
®
®
light assembly into the pool niche. Be sure to
Use only the special pilot screw provided with this
Face ring TAB
(insert into
niche slot)

Capítulos

Tabla de contenido
loading

Tabla de contenido