Echo SRM-225 Instrucciones De Instalación página 5

Ocultar thumbs Ver también para SRM-225:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

U-
handle
install metal shield
Tools Required: 8 x 10 mm Open-end Wrench, Torx T-27 L-Wrench,
T-wrench, Locking Tool
Parts Required: Metal Shield, Shield Bracket,
• 3 - 5 x 10 mm screws (metal shield to gear hous-
ing).
• 2 - 5 x 8 mm screws, 2 - 5 mm nuts, 2 - 5 mm
lock- washers, (bracket to shield).
• 2 - 5 x 35 mm screws, 2 - 5 mm nuts, 2 - 5 mm
lockwashers (bracket to gear housing)
1.
If installed remove nylon line head, upper fixing plate, shield plate,
and plastic shield.
a.
Align locking hole in upper plate with notch in edge of gear
housing and insert head locking tool (A).
b.
Remove line head (B) by turning it clockwise until head is
completely off of shaft.
c.
Remove locking tool.
d.
Remove three screws holding shield plate (D) and plastic
shield (C) to gear housing.
e.
Retain line head (B), upper fixing plate (E), shield plate, and
plastic shield (C) for conversion back to nylon line head
operation.
2.
Loosely attach bracket (F) to shield (G) and attach shield to bottom
of gear housing (H) with hardware provided.
3.
Remove gearcase clamping screws (I) and loosely attach bracket
(F) to gearcase (H) with 2 - 5x35mm screws, nuts and lockwashers
provided in kit.
4.
Tighten all shield hardware.
C
K
i
ombo
it
nstallation
i
nstrUCtions
C
D
F
G
5
A
B
C
E
I
H
Tabla de contenido
loading

Tabla de contenido