Before the starting up
Fill the throat packing nut of fluid sections with lubricant T.
Unscrew the air regulators.
Supply the installation with compressed air (6 bar maximum).
A. STARTING UP
Put 2 bar of air on the posts of the pneumatic ram with the air regulator located on the air unit (maximum 3
bar / 43.5 psi). Check the pressure on the pressure gauge located on this regulator.
Turn the button on the left in "UP" position, the subassembly pump/follower plate must lift slowly to the
higher position.
Put neutral oil on the follower plate seals.
Take the cover off. Slide the material drum under the ram plate and install carefully the interior plastic bag
after bending over the edge outside. Center it roughly after putting the switch handle in neutral position "0"
and shutting off the air flow in the posts of the pneumatic ram with the regulator.
Unscrew the priming rod.
Turn the button on the right. Put a low air pressure on the posts of the pneumatic ram. Center the drum
when the follower plate reaches it. Check the exact position of the seals. The follower plate enters in the
drum.
Adjust the air pressure on the posts of the pneumatic ram and wait until material flows by the hole of the
priming rod. Screw the priming rod.
Open the drain valve located on the pump outlet to drain the air enclosed in the pump.
Open the decompression valve (yellow valve) and put gradually compressed air on the motor of the pump
with the regulator mounted on the air unit.
When the material flows without air bubbles, close the drain valve and then drain at the filter level and/at the
gun level.
Adjust the pressure according to the fluid viscosity :
To avoid the de-energizations during the work : increase the compressed air pressure on the posts
of the pneumatic ram,
To avoid the material overflows : shut off the pressure by closing the air regulator and turning the
button on the right in "DOWN" position. Posts of the pneumatic ram have to be empty of air for the
semi-viscous materials.
NOTA : The pneumatic ram has a drum extraction system, don't use the air drain control system during
the starting up.
B. REPLACEMENT OF THE DRUM
Shut off the air flow of the motor with the regulator, close the decompression valve (yellow valve) and open
the mini valve for the drum extraction.
Adjust the air pressure to 2 bar on the posts of the pneumatic ram with the regulator.
Turn the button on the left in "UP" position. Help the follower plate to rise by pressing intermittently the air
drain control system.
After taking off the follower plate, close the mini valve for drum extraction, scrape under the follower plate
and clean the seals of the follower plate if necessary. Take away the empty drum.
Then follow the procedure in the order indicated from the § "STARTING UP".
C. SHUTDOWN
Shut off the compressed air.
The pumps must remain full with product. The ram plate must stay in contact with the product because it
acts like a cover and avoids that the product dries.
KREMLIN REXSON
Do not press more than several seconds running.
5
Doc. / Dok. : 574.022.110