HOLL'S Venetian Manual De Instalación página 9

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Assemble instructions
Step 4:
Step 5:
Step 6:
Position the front panel in the groove in the flooring, ensuring that it slots perfec-
tly into the left side panel. Important: Keep the door closed while handling this
component.
Finish the assembly of two panels by lockingbuckles.
Unlocked Buckle / Locked Buckle
+
+
+
+
+
Finally, position the right side panel in the groove in the flooring, ensuring that it
slots perfectly into the front and rear panels.
Finish the assembly of three panels by lockingbuckles.
Unlocked Buckle / Locked Buckle
+
+
+
+
+
Carefully position the ceiling.
Then connect Chromotherapy to the electric stove power supply.
+
+
+
+
+
+
+
+
+
+
EN
9
Tabla de contenido
loading

Este manual también es adecuado para:

Graphite

Tabla de contenido